Repair of the connecting rod-piston group ZMZ-402

Repair of the ZMZ-402 connecting rod and piston group

The clearance between the oil control ring and the piston groove should be within 0.135–0.335 mm.

  • Disassembly of the cylinder block of the K4M engine
  • Possible malfunctions Renault Duster
  • Replacing fuses and relays Gazelle Nex
  • Running and stopping the engine of the car Renault Arkana
  • How to replace fuses in a Renault Duster car
  • Design features of the ZMZ-402 engine
  • Replacing sensors Court Cummins ISF2.8 Gazelle Nex
  • Assembling the H4M engine
  • Design features of the K4M engine
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34