We prepare the vehicle for the task and disconnect the battery earth.

We remove the air filter housing and the air filter adaptor, as described in the previous articles.

Disconnecting the linkages and hoses

With a screwdriver, we slacken the screw securing the rod on the air damper lever.

Securing screw of the rod on the air damper lever
The screw securing the rod on the air damper lever is slackened with a screwdriver

If the screw is very tight, we hold the cable securing sleeve with an 8 mm spanner to prevent it from turning.

We slacken the fixing of the rod sheath and withdraw the air damper drive rod from the sleeve.

Rod withdrawn from the securing sleeve
The air damper drive rod is withdrawn from the sleeve after slackening the sheath fixing

We pull the terminals of the two wires off the microswitch terminals.

Wire terminals on the microswitch
The terminals of the two wires are pulled off the microswitch terminals

We pull the hose off the economiser valve union.

Hose on the economiser valve union
The hose is pulled off the economiser valve union

We mark the hoses (coloured insulating tape may be wrapped round them) so as not to mix them up during assembly.

We pull the hose off the vacuum take-off union leading to the overrun cut-off solenoid valve.

Vacuum take-off hose to the solenoid valve
The vacuum take-off hose leading to the overrun cut-off solenoid valve is pulled off the union

We slacken the clip and pull the fuel hose off the union.

Fuel hose with clip on the union
The fuel hose is pulled off the union after slackening the clip

We pull the vacuum advance hose off the carburettor union.

Vacuum advance hose on the carburettor union
The vacuum advance hose of the distributor is pulled off the carburettor union

We slacken the clip and disconnect the crankcase ventilation hose from the carburettor union.

Crankcase ventilation hose on the union
The crankcase ventilation hose is disconnected from the union after slackening the clip

Disconnecting the throttle linkage and removing the carburettor

Using a 10 mm spanner, we undo the nut securing the throttle linkage to the sector, holding the linkage ball joint with an 8 mm spanner.

Nut securing the linkage to the sector
The nut securing the throttle linkage to the sector is undone with a 10 mm spanner while the ball joint is held with an 8 mm spanner

We withdraw the rod from the hole in the sector.

Rod withdrawn from the sector hole
The rod is withdrawn from the hole in the sector after the nut is undone

Using a 13 mm spanner, we undo the four nuts securing the carburettor to the inlet manifold.

Four nuts securing the carburettor
The four nuts securing the carburettor to the inlet manifold are undone with a 13 mm spanner

We remove the carburettor and the paronite gasket.

Carburettor with its paronite gasket
The carburettor is removed together with its paronite gasket

We remove the carburettor base and the second gasket.

Carburettor base with the second gasket
The carburettor base is removed together with the second gasket

Installation

We refit the carburettor in the reverse order.

We connect the wires to the microswitch in any order.

Materials and design features

The carburettor of UAZ vehicles is a two-barrel unit with sequential opening of the throttle valves. The body and cover are of aluminium alloy, the gaskets of paronite or oil- and petrol-resistant rubber. The fuel hose is of oil- and petrol-resistant rubber with a textile braid, the clips are steel, either spring or screw type. The microswitch is a limit switch and serves to control the overrun cut-off solenoid valve. The solenoid valve has a coil and a shut-off needle. The distributor vacuum advance unit is connected to the space downstream of the throttles. During assembly, it is recommended to replace the paronite gaskets with new ones and to renew the hoses if they are cracked or hardened.