Repair of the connecting rod-piston group ZMZ-402
The clearance between the oil control ring and the piston groove should be within 0.135–0.335 mm.
- How to remove the Renault Duster dashboard
- Disassembly and assembly of the cab door GAZelle Next
- Assembling the H4M engine
- Checking and replacing the engine coolant Renault Duster
- Repair and replacement of the oil pump ZMZ-402
- Installation of pistons and rings Diesel 740 KAMAZ
- How to replace fuses in a Renault Duster car
- Checking and replacing the timing belt of the Renault Duster car
- Renault Duster accessory belt check and replacement
- Disassembly and assembly of the VAZ-2107 gearbox