
After disassembled the engine, you need to thoroughly wash all the parts with gasoline and remove carbon deposits.
Before assembling the engine, it is necessary to inspect the cylinder block, cylinder head and all the main parts for assembling the engine.
- How to remove the fuel rail and the VAZ-2112 engine regulator
- Lapping the valves and replacing the valve stem seals of the cylinder head of the 740 Kamaz diesel engine
- How to remove and install the throttle assembly with electric drive VAZ-2123
- Tightening torques for fasteners of diesel engine KAMAZ 740.11-240, 740.13-260, 740.14-300, 740.30-260, 740.50-360, 740.51-320
- Preparation of parts for the assembly of the H4M engine
- Cleaning the crankcase ventilation system of the K4M engine
- Diesel engine K9K
- Checking the elements of the ISF3.8 charging system
- How to remove and install the VAZ-2123 air filter
- Appointment and replacement of the ECM controller with an electronic gas pedal VAZ-2123
- Repair of the coolant pump ZMZ-402
- Assembling the VAZ-2112 engine - continued
- Laying the crankshaft and the piston group in the cylinder block of the KamAZ engine
- Assembling the H4M engine
- Assembly of the connecting rod and piston group of the K4M engine