• Home
    • Safety
  • Separator
    • Mazda 6
    • Nissan Almera
    • Renault Sandero
    • Renault Arkana
  • Separator6
    • Duster
    • GAZELLE NEXT
    • Solaris
    • UAZ car
    • Kia Magentis
  • Separator-2
  • Engines
  • Separator-3
  • transmission
  • separator-4
  • Search

Installation of pistons and rings Diesel 740 KAMAZ

Two compression rings and one oil scraper are installed on the piston.

Compression rings are designed to prevent gases from escaping into the crankcase when they are compressed and expanded

Replacement of DMRV VAZ-2123 with electronically controlled throttle valve for EURO-5

The mass air flow sensor on the VAZ-2123 engine is located between the air filter housing and the air supply hose to the throttle assembly

Adjustment of clearances in the valve drive ZMZ-402

Adjustment of the clearances between the rocker arms and the valves is carried out on a cold engine, with the cylinder head fastening nuts and the nuts for fastening the rocker arm axle struts tightened to the required torque.

  1. How to remove the receiver and intake manifold of the VAZ-2112 engine
  2. Diesel power system D-245.7E3 / D-245.9E3
  3. Replacing the timing belt on the VAZ-2112 engine
  4. Disassembly of the cylinder block of the K4M engine
  5. Removing elements of the Cummins ISF3.8 air intake system
  6. Feature of the crank mechanism of the KAMAZ-740.50-360, KAMAZ-740.51-320 engines
  7. Dismantling and troubleshooting of the crankshaft ZMZ-402

Page 12 of 40

  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16