In accordance with the maintenance regulations, we replace the auxiliary drive belt on a car equipped only with power steering every 60 thousand kilometers or
We remove the cylinder head for repair, to replace the gasket under the head and for a complete engine overhaul.
The Cummins ISF engine control unit has a two-piece connector.
The "A" block is connected to the vehicle's wiring harness. Its composition can vary widely depending on the configuration of the car
Removing the head from the engine was discussed in the article - "Dismantling the cylinder head »
Disassembling the cylinder head in the article - "Disassembling the cylinder head"
In this article, we will consider checking and repairing the cylinder head.
- How to remove and repair the fuel pump ZMZ-402
- Dismantling the cylinder head VAZ-2123
- The operation of the phase regulator of the K4M engine
- Inspection and repair of the Cummins ISF3.8 cylinder block
- How to disassemble the ZMZ-402 engine
- Removing the cylinder head of the VAZ-2123 engine
- Installing the cylinder head of the K4M engine
- Checking the Cummins ISF3.8 injection system
- Defective and repair of the cylinder block ZMZ-402
- Assembling the cylinder block of the K4M engine
- Repair of the VAZ-2123 engine
- Checking Cummins ISF3.8 Starting System Elements
- Repair of the cylinder head of the K4M engine
- Design and characteristics of Cummins ISF3.8 engines
- Disassembly of the VAZ-2123 engine